Loading

← All case studies

PAUT C-Scan Corrosion Mapping During a Refinery Turnaround

PAUT C-Scan Corrosion Mapping During a Refinery Turnaround

The problem

A refinery client needed corrosion mapping on a set of process piping runs and a vessel shell before start-up, but the turnaround schedule only allowed a narrow inspection window and insulation removal on the full line was not practical.

Our approach

IEQS deployed a PAUT C-scan crew alongside conventional UT thickness gauging to prioritize known corrosion-prone zones — dead legs, low points, and areas flagged in the client’s risk-based inspection plan.

  • Targeted insulation removal at RBI-flagged locations only
  • PAUT C-scan grids for area-based wall-loss mapping
  • Spot UT gauging to cross-check scan readings
  • Daily data review with the client’s inspection engineer

Outcome

Corrosion mapping was completed within the turnaround window without delaying start-up. The wall-loss data was handed over as part of the client’s fitness-for-service package for the next inspection interval.

Client and location details are withheld per confidentiality terms; figures are illustrative.

Do you have any questions?

Contact IEQS Technologies nearest to you or submit a business inquiry online.

Contact us