PAUT C-Scan Corrosion Mapping During a Refinery Turnaround

The problem
A refinery client needed corrosion mapping on a set of process piping runs and a vessel shell before start-up, but the turnaround schedule only allowed a narrow inspection window and insulation removal on the full line was not practical.
Our approach
IEQS deployed a PAUT C-scan crew alongside conventional UT thickness gauging to prioritize known corrosion-prone zones — dead legs, low points, and areas flagged in the client’s risk-based inspection plan.
- Targeted insulation removal at RBI-flagged locations only
- PAUT C-scan grids for area-based wall-loss mapping
- Spot UT gauging to cross-check scan readings
- Daily data review with the client’s inspection engineer
Outcome
Corrosion mapping was completed within the turnaround window without delaying start-up. The wall-loss data was handed over as part of the client’s fitness-for-service package for the next inspection interval.
Client and location details are withheld per confidentiality terms; figures are illustrative.
Do you have any questions?
Contact IEQS Technologies nearest to you or submit a business inquiry online.
Contact us