Loading

← All case studies

Remote Field Eddy Current Inspection of Heat Exchanger Tube Bundles

Remote Field Eddy Current Inspection of Heat Exchanger Tube Bundles

The problem

A power plant needed a full-bundle condition assessment of carbon-steel heat exchanger tubes ahead of a planned outage, to decide whether tubes could run another cycle, needed plugging, or required bundle replacement.

Our approach

Remote Field Eddy Current Testing (RFET) was selected for its sensitivity to both ID and OD wall loss in ferromagnetic tubing, which conventional eddy current struggles with.

  • Full-bundle RFET scan of all accessible tubes
  • Signal correlation against calibration standards for wall-loss severity
  • Tube-by-tube condition grading (accept / monitor / plug)

Outcome

The client received a graded tube map ahead of the outage, allowing plugging decisions to be made in advance rather than reactively during the outage window.

Client and location details are withheld per confidentiality terms; figures are illustrative.

Do you have any questions?

Contact IEQS Technologies nearest to you or submit a business inquiry online.

Contact us